What stage is FOUR 94 at?
Plan sanction has been received and the foundation and basement are complete. The construction journal updates with site photographs as each phase advances, with completion targeted for February 2028.
Is it for sale or for lease?
The two road faces let us place non-competing businesses side by side, shops and banking at street level and offices above. Ask us about taking a whole floor or part of one. See whole-building & anchor-tenant leasing options →
What is the configuration?
FOUR 94 is Basement + Ground + 3 floors on a corner plot with roads on two sides, with shops at street level and office floors above.
Why a corner plot?
Two roads face the building, giving better signage and visibility than a single-road plot could, and separating retail footfall from office access through independent flows.
Is the project RERA registered?
K-RERA registration is in progress; the number will be displayed once issued. We’re happy to share the current approval status on request.
Can I get the full investment detail?
Yes, request the project brochure above, or book a meeting with the founder’s team on WhatsApp.
How can I check the approvals?
We’re glad to walk you through the full sanctioned plan and approval status during diligence, just ask. We’d also encourage you to have your own advocate verify everything independently before you commit.
Is the title clear?
The land is held on a registered katha. We’ll hand over the title documents and the encumbrance certificate so your own advocate can verify everything independently before you commit.
Who is building it?
The plan is prepared by a licensed architect, and, as the sanction requires, construction runs under the supervision of a registered structural engineer. We’ll introduce you to the team on a site visit.
What if completion is delayed?
February 2028 is the date we are working toward, and the construction journal updates as each stage completes, so you can see real progress rather than take our word for it. Any firm timeline sits in your sale agreement, we don’t make promises we can’t put in writing.
How do payments work, is my money safe?
Payments are linked to construction milestones and set out in your agreement. We never ask for unaccounted cash, and every payment is receipted. Verify the approvals first, then proceed only on paperwork you’re comfortable with.
Can I visit the site?
Yes, it’s the best way to judge it for yourself. Book a site visit and we’ll arrange a time that suits you.
Is FOUR 94 available for a single anchor tenant on a whole-building lease?
Yes. FOUR 94 is a standalone B+G+3 commercial building, available to a single anchor tenant on a whole-building lease, floor by floor as a strategic pre-lease, or as a full build-to-suit. Expected completion is 2028.
Is FOUR 94 available for pre-leasing or build-to-suit?
Yes. FOUR 94 can be pre-leased before completion and delivered as a build-to-suit. A single occupier can customise the fit-out floor by floor or take the whole building, and the ground and first floors can be combined.
What is a post-tensioned, column-free floor plate, and why does it matter at FOUR 94?
Every floor at FOUR 94 is built on post-tensioned (PT) beams that span the full plate, so there are no internal columns. That delivers near-100% usable carpet area and interiors you can configure freely, with walls and workstations placed where the business needs them rather than around a column.
How much more usable area does a column-free plate give versus conventional column-grid construction?
Conventional column-grid construction places supports across the floor, reducing usable area and forcing layouts around fixed points. FOUR 94's post-tensioned plates move structure to the perimeter, giving near-100% usable carpet area and full layout flexibility on every floor.
How does FOUR 94's dual road frontage help corporate signage and brand visibility?
FOUR 94 sits on a corner where two 44-foot roads meet, giving two full frontages. That means signage and sightlines in two directions, separate approaches for retail footfall and office access, and visibility a single-road plot cannot replicate.
Does FOUR 94 have full power backup for uninterrupted operations?
Yes. FOUR 94 runs 100% diesel-generator (DG) backup for common areas and essential tenant loads, so operations continue during a mains outage, with a single accountable owner-operator responsible for the building.
How does Ameya Heights' Built, Owned and Managed model work for a corporate tenant?
Ameya Heights builds FOUR 94, retains ownership after completion, and manages it directly. There is no absentee landlord and no third-party handoff; the same team that signs the lease stays accountable for the building through the life of the occupancy.
What makes FOUR 94 different from commercial space in Grade-A towers like Prestige, Brigade, Embassy, RMZ or Sobha?
Those are typically floors within large, shared multi-tenant towers. FOUR 94 is a standalone building a single company can take in full, with its own identity, dual-corner visibility, column-free floors, and a developer who owns and manages the building directly rather than handing it to third-party facility management.